Solar Decathlon China 2018 deliverables and due dates below are updated on 26 Aug 2017
and are provided as a general guideline for your future work.
Due Date | ID | Deliverable Name | Payment | Rules Reference | Format | Delivery Method | |
---|---|---|---|---|---|---|---|
Thu, 26 May 2016 | D-1 | Team Short Description & Project Management Plan | n/a | Appendix D-1 | |||
Team Excitement Video | n/a | n/a | MOV | Dropbox | |||
Thu, 30 Jun 2016 | D-2 | Schematic Design Summary | 5% | Appendix D-2 | Dropbox | ||
Target Construction Cost (preliminary) | n/a | n/a | ELSX | ||||
Thu, 29 Sep 2016 | D-3 | Team Overview | n/a | Appendix D-3 | Dropbox | ||
Website (preliminary) | 5% | Appendix E-1 | URL | ||||
Thu, 24 Nov 2016 | D-4 | Design Development Phase | BIM | 5% | n/a | SKP | Dropbox |
Drawings | 15% | Appendix D-4 | Dropbox | ||||
Project Manual | 10% | Appendix D-4 | Dropbox | ||||
Health and Safety Plan (preliminary) | 5% | Appendix F | Dropbox | ||||
Scale Model | 5% | Appendix E-4 | |||||
Target Construction Cost (revised) | n/a | n/a | ELSX | ||||
Thu, 29 Dec 2016 | D-5 | Computer-Animated Walkthrough | 5% | Appendix E-2 | MOV | Dropbox | |
Computer-Generated Renderings | n/a | Appendix D-5 | PNG | Dropbox | |||
Thu, 26 Oct 2017 | D-6 | Construction Documentation Phase | BIM | 5% | n/a | SKP | Dropbox |
Drawings | 10% | Appendix D-6 | Dropbox | ||||
Project Manual | 5% | Appendix D-6 | Dropbox | ||||
Health and Safety Plan (final) | 5% | Appendix F | Dropbox | ||||
Target Construction Cost (final) | n/a | n/a | ELSX | ||||
Foundation Drawings and Specifications | n/a | Dropbox | |||||
Stamped Structural Submission | Appendix D-6 | Dropbox | |||||
Thu, 25 Jan 2018 | D-7 | Project Summary | 5% | Appendix D-7 | ZIP | Dropbox | |
Thu, 22 Feb 2018 | D-8 | Public Exhibit Materials (preliminary) | 5% | Appendix E-5 | Dropbox | ||
Thu, 29 Mar 2018 | D-9 | As-Built Phase | BIM | 5% | n/a | SKP | Dropbox |
Drawings | Appendix D-8 | Dropbox | |||||
Project Manual | Appendix D-8 | Dropbox | |||||
Audiovisual Presentation | Appendix D-8 | Dropbox | |||||
Jury Narratives | Appendix D-8 | Dropbox | |||||
Public Exhibit Materials (final) | Appendix E-5 | Dropbox | |||||
Website (final) | Appendix E-1 | URL | |||||
Thu, 27 Sep 2018 | D-10 | Final Report | 5% | Appendix D-9 | Dropbox |